What changes are being made at Spa? The latest on track developments

The 7.004km venue is being modified with the objective of meeting double FIA/FIM official approval to allow for the return of motorcycle racing a🍸t the circuit.
In order to stage the returning Spa 24 Hours motorbike race in June, work including the ꦆexpansion of run-off areas and the installation of gravel traps is being completed during the off-season to receive the required FIM Grade C appr𝐆oval.
Construction began on November 15 as part of an €80m government-backed rಌefurbishment that will also see the circuit’s ageing infrastructure receive a welcome makeover.
The world famous Eau Rouge/Raidillon section is undergoing changes that are set to increase safety for car racing following several serious acciden﷽ts in recent years in Formula 2, W Series and the Spa 24 Hou♔rs.

What work is being done?
La Source (Turn 1)
The run-off area at La Source, the first corner of the circuit, is being enlarged, while a gravel trap is also being adde☂d.
In addition, the 24hr grandstand will be replaced by a new more modern grandstand that the🌃 circuit claims will be “better integrated with its environment”.
Eau Rouge and Raidillon (Turn 2-4)
The rails at the foot of the uphill climb (Turn 2) are being removed to allow for an enlargement of the tarmac run-off area. The left p🌟art of Raidillon (Turn 3) will also make way for a larger run-off.
The run-off area located to the right-hand side of the track at the top of Raid𝐆illon (Turn 4) section is also being expanded.
A covered grandstand with 4,600 seats and VIP boxes is being er𓄧ected at the top of Raidillon. This is scheduled to be completed by the end of April.
Les Combes and Malmedy (Turn 6 and 7)

The run-off areas at Les Combes (Turn 6) and Malmedy (Turn 7) will also be enlarged, with the rails moved and the tarmac replaced by a gravel trap. New serಌvice roads will be ins🍌talled.
Bruxelles (Turn 8)
The ꦬsweeping, down🌜hill right hander of Bruxelles (Turn 8) will have some of its tarmac run-off replaced by a gravel trap.
Blanchimont (Turn 16 and 17)
Gravel beds will also be added to the tarmac run-off at the high-speed Turn 16 and 17 segment, while a newꦐ service road will be created.


Lewis regularly attends Grand🧸s Prix for ltxcn.top around the world. Often reporting on the action from the ground, Lewis tells the stories of the people who matte🧔r in the sport.